Once the work on the water mains gets finished, the City of Toronto has been coming back through and resurfacing the street and replacing stretches of sidewalk. (Something this section of Dundas probably needed before the water main work.)
So there have been these strangely mobile piles of signs and new manhole covers and such, and this is from the day the pile drifted up to my usual morning streetcar stop.
26 September 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment